Aller au contenu
Fini la pub... bienvenue à la cagnotte ! ×
AIR-DEFENSE.NET

[Russie] Marine Russe - VMF (sujet général)


Francois5 v2.1

Messages recommandés

Russia to Go Ahead With Lavina Amphibious Assault Ship Project, Preliminary Design Completed
YmhGUkV.jpg

http://www.navyrecognition.com/index.php?option=com_content&task=view&id=3335

The Krylov State Research Center completed the preliminary design of the versatile amphibious assault ship for the Russian Navy, the center’s executive director, Mikhail Zagorodnikov, told TASS on Thursday. He also said there is "no doubt" the ship will be developped. The Lavina (Avalanche) project was first unveiled during the ARMY-2015 defense exhibiton.  "Krylov Central Scientific Research Institute is developing an alternative to the two Mistral LHDs. Avalanche will have a displacement of 24,000 tons, even more than the French ship" - a spokesman said at the time.

  • Upvote (+1) 1
Lien vers le commentaire
Partager sur d’autres sites

Russia to Go Ahead With Lavina Amphibious Assault Ship Project, Preliminary Design Completed
YmhGUkV.jpg

http://www.navyrecognition.com/index.php?option=com_content&task=view&id=3335

24 000 Tonnes qu'il fera le bébé, ça veut dire qu'ils se font un BPC un peu plus gros que ceux qu'ils nous avaient commandés, de là à y voir un message subliminal du genre "Vous n'avez pas voulu nous les vendre, eh bien maintenant on fait plus gros et plus beau" *

* Pour le côté plus beau d'ailleurs ils n'auront pas de mal car faut reconnaître que l'esthétique n'est vraiment pas le point fort des BPC "Mistral"...    

Lien vers le commentaire
Partager sur d’autres sites

La flotte de la Mer Noire vient de recevoir son 7ème petit vaisseau rapide de patrouille & combat (projet 03160), construit par les chantiers Pella de Leningrad > 

The Russian-made 7th Project 03160 patrol boat has competed state trials and has been accepted for operation, the Pella Shipyard’s press office said on Friday. The Russian shipyard Open Joint Stock Company "Pella" is based in Leningrad. According to the press office, the new boat has already arrived at its permanent base and will join Russia’s Black Sea Fleet in the imminent future.

Ces bateaux, dont la ligne ressemble fortement à celle du fameux CB-90 de la firme suédoise Döcksta-Varvet, sont armés d'une mitrailleuse télé-opérée de 14.5mm + 2 mitrailleuses manuelles de 7.62mm 

http://www.navyrecognition.com/index.php?option=com_content&task=view&id=3338
 

Lien vers le commentaire
Partager sur d’autres sites

Sur Friday, December 04, 2015 at 17:23 , kalligator said:

selon la revue DSI de décembre les russe auraient mis au point un drone sous marin tiré depuis des OSCAR ou DELTA muni d'une d'une tête nuc sale...une saloperie digne de la MAD

La fameuse fuite lors d'une conférence de presse, j'imagine. Perso je ne vois pas la plue-value par rapport aux têtes nuc classiques.

Lien vers le commentaire
Partager sur d’autres sites

La mise en service de la frégate Amiral Gorchkov (Projet 22350) a été de fait repoussée à 2016. Le navire est rentré à Severodvinsk après des essais réalisés en mer Blanche (test de missiles Kalibr). La frégate doit gagner Severomorsk pour hiverner, et retrouvera ensuite Severodvinsk.

Le bureau pétersbourgeois Rubin a conçu près de 943 projets de bâtiments de toutes classes en 115 ans d'activité. 85% des submersibles qui ont été mis en service dans la marine impériale puis soviétique, ou sont en service dans la marine russe, sont issus de ses bureaux.

http://www.rusnavyintelligence.com/2015/12/lundi-21-decembre-2015.html

 

Le premier ministre indien Narendra Modi sera à Moscou du 23 au 24 décembre pour un contrat d'armement portant entre autre sur la vente de 2 Kilo supplémentaire, d'un leasing pour un SSN 971 Akula ainsi que pour la vente de 3 frégates de type Amiral Grigorovitch (Projet 11356M) issue de la Flotte de la Mer Noire (!?). Le constructeur VPK n'ayant plus accès aux turbines construites en Ukraines.

http://www.rusnavyintelligence.com/2015/12/armements-qu-attendre-de-la-visite-de-modi-a-moscou.html

Lien vers le commentaire
Partager sur d’autres sites

2 New Project 22800 Corvettes Uragan & Typhoon Laid Down by Pella Shipyard for Russian Navy
T6LJlwf.jpg

http://www.navyrecognition.com/index.php?option=com_content&task=view&id=3401

Two new Project 22800 guided missile corvettes were laid down for the Russian Navy by the Pella Shipyard in St. Petersburg on December 24th, TASS reported from the shipyard on Thursday. According to the shipyard’s spokesperson, the lead ship, the Uragan, is to be commissioned by the Russian Navy in December 2017 and the first production ship, the Typhoon, in 2018.

Lien vers le commentaire
Partager sur d’autres sites

Donc si on comprend bien :

- La classe 11356 Grigorovich qui se composait de 6 frégates Talwar modernisées (elles-mêmes issues des séries Krivak) et devait former l'ossature de la flotte de surface de la mer noire ne verra que ses 3 premières unités rentrer en service puisque seuls les 3 premiers équipements de propulsion ukrainiens ont été livrés avant le gel du contrat du aux evements en ukraine. Et la Russie cherche donc à refourguer les 3 suivantes (sans l'appareil propulsif qui devra être trouvé par le pays acquéreur) à l'export, probablement à l'inde.

- Et pour compenser cette arrêt, la classe 22800 est lancée, soit une corvette légère d'environ 800 / 1000 tonnes, avec comme armement principal 8 UKSK Kalibr.

  • Je trouve ca un peu étonnant de vouloir remplacer ces frégates Grigorovich de 4000 tonnes lourdement armées par une classe de corvettes légères, apparemment sans armement ASM (alors que c'est ce qu'il manquait à la flotte de la mer noire).
  • De même pourquoi lancer une nouvelle classe de corvettes de 1000 tonnes avec armement Kalibr alors que la classe Buyan améliorée (21631) possède les mêmes caractéristiques et que plusieurs sont actellement en construction.

Plus le temps passe moins je comprends les plans opérationnels et industriels de la Marine russe ... Ils ont l'air d'avoir beaucoup de mal à définir un format de flotte homogène, et surtout à tenir leur plan industriel.

 

Modifié par EOA
Lien vers le commentaire
Partager sur d’autres sites


Project 22800 Corvettes to be Fitted with Pantsir-M Naval Variant of Pantsir-S1 Air Defense System
vdKVM9i.jpg

Project 22800 corvettes will in the future be armed with ship-based air defense systems, specifically, Pantsir-M air defense missile/gun system, Vice-Admiral Victor Barsuk, Russian Navy Deputy Commander for armaments, said.

"The ship is highly upgradable and in the future will be outfitted with ship-based air defense systems like Pantsir-M," Barsuk specified.
http://www.navyrecognition.com/index.php?option=com_content&task=view&id=3407

Russian Navy Future Frigate Project 22350 Admiral Gorshkov Completed 1st Phase of Trials
MCB57ee.jpg

http://www.navyrecognition.com/index.php?option=com_content&task=view&id=3405

The Project 22350 frigate Admiral Gorshkov passed the first stage of its White Sea tests, Capt. 2nd Rank Andrei Luzik, acting chief, press office, Northern Fleet, told journalists on Friday. "The tests have taken place at naval training areas of the Northern Fleet in the White Sea and Arkhangelsk Region," he added.

Russian Navy New Mine Countermeasures Vessel Project 12700 Alexander Obukhov in Sea Trials
ixQndii.jpg

http://www.navyrecognition.com/index.php?option=com_content&task=view&id=3403

Project 12700 Alexander Obukhov lead mine countermeasures vessel (MCMV) has started technical trials, an official of the Medium Neva Shipyard, the manufacturer of the ship /incorporated by United Shipbuilding Corporation, USC (OSK)/ told the TASS correspondent.

Lien vers le commentaire
Partager sur d’autres sites

Citation

Les Russes avaient aussi présenté une maquette du destroyer leader, un projet qui date du début des années 1990.

Déjà qu'ils n'arrivent pas à produire efficacement de simples frégates de 4000 tonnes, alors des destroyers de 10 000 tonnes armés jusqu'aux dents ...

Ils foisonnent de projets en tout genre mais n'arrivent pas à les concrétiser et les programmes qui tiennent le rythme sont peu nombreux pour le moment. Il s'agit soit de classes basées sur des anciens modèles éprouvés et modernisés :

  • projet 636 (Kilo modernisé) pour les soum' conventionnels
  • projet 11356 Grigorovich (Talwar modernisées) pour les frégates
  • corvettes 21631 Buyan
  • et des forces stratégiques qui ont toujours eu la priorité (programme Borei 955 qui se déroule bien et les problèmes Boulava semblent réglés).

Par contre pour tout le reste c'est le bordel complet :

  • Les nouveaux sous-marins d'attaque classiques et nucléaires au point mort Lada/amour (677) et Yasen (855)
  • Les frégates Gorshkov dont la tête de série non admise au service actif a été mise en cale il y a 10 ans.
  • Les problèmes d'approvisionnement en turbines compliquent encore davantage la construction de ces dernières, et les frégates 11356 Grigorovich qui se construisaient bien sont du coup stoppées.
  • Les navires amphibies l'Ivan Gren a mis plus de 10 ans à être construits et n'est toujours pas ASA.
  • Et pour les bâtiments légers type corvette de combat, c'est un bordel complet avec plusieurs classes différentes qui mordent sur les mêmes spectres de mission, avec des dérivés de classe qui changent tous les ans, des retours en arrière etc.

En attendant la flotte soviétiques déjà largement dépassée se réduit comme peau de chagrin et les nouvelles unités rentrent ASA au compte goutte.

Alors quand on entend parler de destroyers de 12 000 tonnes et de porte-avions de 100 000 tonnes ca fait quand meme un peu rigoler ... Qu'ils commencent déjà par reconstituer leur flotte de surface avec des corvettes et des frégates modernes, en nombre suffisant, et de classes homogènes, idem pour la flotte sous-marine et l'aéronavale, et après ils pourront réfléchir aux destroyers et aux PA. Sinon c'est un peu comme vouloir refaire les tuiles d'un chateau quand les fondations se fissurent et les murs s'écroulent...

 

Modifié par EOA
  • Upvote (+1) 2
Lien vers le commentaire
Partager sur d’autres sites

Citation

Pour les turbines je crois que le problème est réglé, ils se fournissent chez NPO non ?

Officiellement c'est réglé. Maintenant il faut voir ce que ca va donner, puisqu'apparemment ca ne passe pas pour les 3 frégates 11356 Grigorovich restantes. Par contre ca conviendrait pour les Gorshkov 22350. Et NPO n'envisageait pas de livraisons avant 2018/2019, avant de se faire gentimment tordre le bras par l'Etat et la Marine qui ont annoncé une livraison des premières turbines en 2016 (2017 max...). J'attends de voir ce que ca va donner.

Donc soit les 3 dernières 11356 basées sur des anciennes frégates sont radicalement différente des Gorshkov et ne peuvent pas intégrer de nouvelles turbines ce dont je doute, soit les russes préfèrent réserver les premières unités produites par NPO pour les Gorshkov, programme vital pour eux qui a toutes les peines du monde à avancer. Même en comptant que les turbines NPO soit livrées à temps, les 3ème et 4ème gorshkov ont vu leur construction ralentie. Autant dire que la cible de 6 frégates lancées pour 2020 ne sera probablement pas atteinte.

Au moins d'ici là espérons qu'ils auront eu le temps de qualificer les deux premières et de profiter des RETEX pour aller un peu plus vite!

 

Modifié par EOA
Lien vers le commentaire
Partager sur d’autres sites

Une explication/excuse du patron de OSK concernant les retards...

Russia's OSK Shipyard to Have Technological Capabilities to Build Aircraft Carriers from 2019

The United Shipbuilding Corporation (OSK) will have the technological capabilities to build helicopter carriers and aircraft carriers starting from early 2019, OSK Director General Alexei Rakhmanov has told the Russia 24 TV broadcaster in an interview. "We will be prepared for helicopter carrier construction just like we are prepared for building aircraft carriers," he said.

"Speaking of the technological capabilities of aircraft carrier construction, we expect them, most probably, by early 2019 once the planned modernization has been completed. This will afford us a degree of preparedness enabling us to build superships, be them civil or military," Rakhmanov added.
...
He stressed that the manufacturer "has made a lot of efforts to fulfil as much of its defense procurement program as possible", but has been unable to fulfil 100% of it for a number of reasons. "First of all, this is due to a rather big number of lead ships we have to build. They are complex products, and much development work has to be performed first before they are built," he added.
http://www.navyrecognition.com/index.php?option=com_content&task=view&id=3411

Quand au PA... oui on verra

Lien vers le commentaire
Partager sur d’autres sites

Selon un communiqué de WMMP (Wuhan Marine Machinery Plant Co., LTD) du groupe de construction navale CSIC, la société a livré les VPP (Variable-pitch propeller) au marché russe.

http://www.wmmp.com.cn/wmmpxwzx/cjxw/313587.htm

20151214085609763504.jpg

Des systèmes de ravitaillement militaire en mer seront également exportés. Même si on n'a pas encore la confirmation du client final, le communiqué parle d'une classe de pétrolier ravitailleur russe de 9000 t. Il devrait s'agir de la nouvelle classe de pétrolier ravitailleur russe Project 23130 Academician Pashin.

Le contrat porte sur 5 systèmes de ravitaillement, il a été signé le 18 Mars 2015.

http://www.wmmp.com.cn/wmmpxwzx/cjxw/306023.htm

Henri K.

Modifié par Henri K.
Lien vers le commentaire
Partager sur d’autres sites

  • 3 weeks later...

Créer un compte ou se connecter pour commenter

Vous devez être membre afin de pouvoir déposer un commentaire

Créer un compte

Créez un compte sur notre communauté. C’est facile !

Créer un nouveau compte

Se connecter

Vous avez déjà un compte ? Connectez-vous ici.

Connectez-vous maintenant
  • Statistiques des membres

    5 996
    Total des membres
    1 749
    Maximum en ligne
    erthermer
    Membre le plus récent
    erthermer
    Inscription
  • Statistiques des forums

    21,6k
    Total des sujets
    1,7m
    Total des messages
  • Statistiques des blogs

    4
    Total des blogs
    3
    Total des billets
×
×
  • Créer...